PLN: 1 of 2 disrupted power plants in Java returns online
Rolling blackouts last week have been minimized since Sunday night after the unit resynchronized at 18.00 WIB.
Republika, CNBC Indonesia
Rolling blackouts last week have been minimized since Sunday night after the unit resynchronized at 18.00 WIB.
Fuel supply to PLN and IPP plants is back to specification after two large units dropped off the system on 19 June.
Yusuf Didi Setiarto joins as deputy president director in PLN’s 12-member leadership shake-up.