Freeport targets 43 tons of gold output in 2028 after GBC slide
Grasberg Block Cave is projected to return to full capacity in the second half of 2027, with 2026 gold output near 21 tons.
Antara News, Republika +1
Grasberg Block Cave is projected to return to full capacity in the second half of 2027, with 2026 gold output near 21 tons.
The 12% share transfer to the government must be signed before a new IUPK is issued in 2041.